The Leader In Well Temperature Control! 

Our Equipment

Home >> The Drill Cool System
The Drill Cool System

The Drill Cool System can be used in its entirety. Some customers only see need for surface cooling, while others recognize a need to stop heat transfer through drill pipe. Others still find that using the Drill Cool System (IDP and surface cooling) in its entirety is the best application for their drilling needs.

The following illustrations and diagrams will provide some possible scenarios for the customer to consider when evaluating their potential high temperature drilling situations.


Field Test Presentation

Why Insulated Drill Pipe?

  • Reduce bottomhole temperatures while drilling geothermal wells
  • Solve multiple problems
  • Preserve drilling fluid
  • Reduce corrosion
  • Enhance bit life
  • Enhance mud motors
  • Enhance MWD/LWD
  • Improve casing cement
Read more...
 
Bottom Hole Temperatures

Bottomhole Temperatures

 
Case Studies

Case Example - Using GeoTemp

HPHT well near Mobile Bay combination string of 5" & 5 1/2" drill pipe. 7 5/8" hole section from 17k to 23k with estimated circulating rate of 400gpm. BHCT reduced from near 360F to below 160F if a full string of comparable size IDP is used.

Read more...
 
Temperature Modeling

To aid our customers in the process of evaluating drilling temperatures, we have an online Temperature Modeling form that can be sent to Drill Cool Systems for closer evaluation.

Read more...